Hello all,
When I am trying to create a Planning proposal from Supply planning WoC for a product (In house Manufactured) I am getting an error saying No REM exists for the given date, Please check the Available date. When I change the date then the system is creating the Production proposal.
I am getting this error even though I have a released Production model and all the prerequisites to produce the material..
Am I missing anything?
Please help.
S.Vijay Chandu
+91-9052986708